Quick Contact
Home › Verticals › Offshore Energy
Vertical

Offshore Energy

End-to-end design and engineering for offshore energy assets — from concept development and basic design through to detailed engineering, production engineering and technical services for FPSOs, Jack-ups, Semi-submersibles and Drill Ships.

1000+
Projects
FPSO & Jack-up
Specialists
80+
Engineers Worldwide

Overview

Cybermarine delivers specialized engineering solutions across offshore assets including FPSOs, FSOs, FLNGs, and Floating Production Units. Our expertise spans the full project lifecycle—from concept and FEED to detailed engineering, integration, and conversion.

With a strong foundation in naval architecture, hull structural engineering, hydrodynamics, and marine systems design, we have successfully supported complex offshore projects for global clients such as BW Offshore, TotalEnergies, Keppel Shipyard, and Husky CNOOC.

Our Capabilities Include:

  • Hull and marine system design and detailed engineering
  • Global and local structural analysis, fatigue and strength assessment
  • Stability, weight estimation, and regulatory compliance (ABS, DNV, NORSOK)
  • 3D modelling, integration engineering, and production detailing
  • Marine P&IDs, system calculations, and technical documentation

Cybermarine has also demonstrated strong problem-solving capability through innovative engineering solutions—optimizing safety systems, improving layouts, and reducing operational constraints without compromising compliance.

Our track record across new builds, conversions, and FEED studies positions us as a reliable engineering partner for offshore developments worldwide.

1000+
Projects
5
Asset Types
CFD & Model
Testing
30+
Years Experience

Offshore Energy Projects

A closer look at FPSO, FLNG, FSO and FPU projects delivered by the Cybermarine team. Click a project to see full scope of work.

FPSO Parque De Balais FPSO
Undisclosed
FPSO Parque De Balais
Brazil — Marine Basic & Hull Detailed Engineering
Naval Architecture Hull Structure Marine Systems E3D Modelling EICT
Project Overview

Marine and hull engineering for a major FPSO project offshore Brazil, covering both basic and detailed engineering phases.

Scope of Work
  • Marine Systems Basic Engineering
  • P&ID for all marine systems
  • Line list and Valve list preparation
  • Hull detailed engineering
  • Complete E3D modelling for Hull and Main Deck
  • Complete Integration Engineering
  • Marine EICT detailed engineering
FPSO Total Energies Angola & Suriname FPSO
Total Energies
FPSO Total Energies Angola & Suriname
Angola / Suriname — FEED Marine Basic Engineering
FEED Marine Systems PFD Utilities 3D Modelling
Project Overview
Front End Engineering Design (FEED) for marine systems for Total Energies' FPSO projects across Angola and Suriname.
 
Scope of Work
  • Marine Systems Basic Engineering
  • PFD for all marine systems
  • Utilities Calculations
  • Preliminary 3D modelling for Hull and Main Deck
FLNG Golar GIMI – Conversion FLNG
Keppel Shipyard, Singapore
FLNG Golar GIMI – Conversion
Singapore · 2018–2019 — Conversion Engineering
Conversion Sponson Engineering Structural Analysis Pipe Routing
Project Overview
 
 
Conversion engineering for the Golar GIMI FLNG vessel at Keppel Shipyard, Singapore, covering structural and mooring analyses.
Scope of Work
  • Sponson Engineering and Analysis
  • Local analysis of Equipment Foundations
  • Jetty Mooring and Berthing Calculations
  • Pipe routing and ISO generation
Floating Production Unit FPU
Husky CNOOC
Floating Production Unit
Indonesia · 2017–2018 — FEED & Tender Stage Hull & Marine Design
Basic Design FEED Hull & Marine P&ID Flare Tower
Project Overview
 
 
Full responsibility for hull and marine engineering during FEED and tender stages for Husky CNOOC's floating production unit in Indonesia.
Scope of Work
  • Basic design of Hull and Marine systems
  • FEED & Tender stage design
  • Total responsibility for Hull and Marine
  • Marine P&IDs, Datasheets, Specifications and Philosophies
  • Detailed Engineering for Flare Tower / Riser Porch and Helideck
FPSO Catcher – New Build FPSO
BW Offshore / IHI Corporation
FPSO Catcher – New Build
North Sea · 2014–2016 — Naval Architecture – Detailed Engineering
Naval Architecture Global Analysis TSAS tability NORSOK DNV
Project Overview
 
 
 
 
Naval architecture at detailed engineering stage for the FPSO Catcher new build, designed to NORSOK/DNV rules for BW Offshore and IHI Corporation.
Scope of Work
  • Naval Architecture at Detailed Engineering Stage
  • Hull Global Analysis
  • TSA Analysis for Transverse Strength
  • Weight Estimate for Hull
  • Stability Analysis for Hull
  • Designed with NORSOK / DNV Rules
  FEED – Al Shaheen Field FSO FSO
JV – NOC & Total Energies
FEED – Al Shaheen Field FSO
Qatar — Hull & Marine Engineering (with Minimal Process & Storage)
FSO FEED Hull Modification Marine UFD Boat Impact
Project Overview
 
 
FEED-stage hull and marine engineering for the Al Shaheen Field FSO in Qatar, jointly for NOC and Total Energies.
Scope of Work
  • Hull Modification Drawings
  • Naval Architecture
  • Marine UFD and PFDs
  • Boat Impact Study
  • Marine Mechanical Datasheets and Specifications
New Build FPSO – Gato De Mato FPSO
BW Offshore
New Build FPSO – Gato De Mato
Brazil · 2022–2023 — Naval Architecture – Basic Engineering
Naval Architecture Fatigue Analysis TSALQ Scantling ABS
Project Overview
 
 
 
 
Naval architecture at basic engineering stage for the Gato De Mato new build FPSO for BW Offshore, designed to ABS rules.

 

Scope of Work
  • Naval Architecture at Basic Engineering Stage
  • Hull Global Analysis and Fatigue Analysis
  • TSA Analysis for Transverse Strength
  • Weight Estimate for Hull
  • LQ Scantling Check
  • Designed with ABS Rules
FPSO Parque De Balais – Safety Engineering
Undisclosed
FPSO Parque De Balais – Safety Engineering
Brazil — CO₂ Fixed Firefighting System Optimisation
Safety Engineering SOLAS CO2 System Fire Fighting Layout Optimisation
Project Overview
 
Cybermarine proposed and engineered an innovative solution to significantly reduce the CO₂ firefighting system footprint without compromising SOLAS safety requirements.
 

 

Scope of Work
  • Assessment of essential generator room classification under SOLAS Cat-A rules
  • Relocation of Essential Generator to a separate, smaller compartment within the engine room
  • CO₂ system sizing based on new compartment volume — considerably fewer bottles required
  • Improved overall layout and reduced space demand
  • Solution validated without compromising safety or regulatory compliance

See our offshore energy work in action

Browse completed FPSO, jack-up, drill ship, and tender vessel projects across our full project portfolio.

Go to Projects →

Have a Offshore Energy project in mind?

Tell us about your vessel or conversion requirements and we will outline an approach.

Contact Us View All Projects
✕
Expanded view